Versorgung einer Papierfabrik mit Produktions- und Heizwärme

The plant with a total output of 200 t/h superheated steam was constructed to supply a cardboard machine with heat. Along with the pressure reducing station, a steam turbine with an electrical output of 7 MW was integrated.

Read More
Heißdampfkessel zur Versorgung einer chemischen Fabrik mit Prozess- und Raumwärme

This boiler replaces an uneconomical cogeneration plant with a water-tube boiler and is operated in fully automatic mode and on a surveillance-free basis. Particular importance was placed on high availability, which was implemented by means of redundancies both in the device technology and in the electrical engineering and in a consistent individual burner operation.

Read More