Current news
VKK Standardkessel on the exhibition “Zellcheming 2019”
VKK Standardkessel had a successful presentation on the Zellcheming Expo in Frankfurt on the Main between 25.06. – 27.06.2019. Many decision makers of the paper industry were interessted in the scope of delivery and service of VKK Standardkessel GmbH. Based on that, many contacts were made or maintained. Special interests were focused on the daily…
Read MoreVKK got the order for a boiler in Egypt
VKK STANDARDKESSEL Köthen GmbH got the order for a complete boiler unit including economiser, equipment around the boiler and the burner system for a client in Egypt.
Read MoreMajor Contract for the site „Nossener Brücke“
VKK STANDARDKESSEL Köthen GmbH will deliver the new steam generation plant for the combined heat and power station “Nossener Brücke” in Dresden, which belongs to DREWAG – Stadtwerke Dresden GmbH. This combined heat and power station was built in 1995 with an electrical power generation of 270 MW (at -15°C) and a thermal capacity of…
Read MoreVKK Standardkessel GmbH wins Major contract
The Papierfabrik Palm GmbH & Co. KG accepted the bid of VKK for the delivery of 2 steam boilers with a steam load of 70 t/h of each boiler. In Aalen (Germany), the Papierfabrik Palm GmbH & Co. KG builts the world’s largest and fastest paper maschine, for the generation corrugated paperboard as raw material with…
Read MoreCompanies from Saxony-Anhalt in Iran: red carpet for investors
Piece from the Mitteldeutsche Zeitung newspaper from 31/05/2016 First, a short excerpt from the Koran is read. A video sequence is run simultaneously, in which waves on the sea, horses in the desert and destruction through war are shown. Subsequently, the German and Iranian national anthems are played. Business discussions at the Hotel Espinas in…
Read More